Know before you commit
The most expensive construction decisions get made before anyone breaks ground. Buying the wrong site, underwriting a number that was never real, or finding out about a utility constraint in month one: those are the ones that cost you.
A feasibility study is how you find out early, while changing your mind is still cheap. We look at the site, the building, the budget and the schedule, and we tell you what we actually think. Sometimes that means telling you the project doesn’t work. We would rather help you discover the issues on the front end and not once you are pricing your permitted drawings.
We start with what’s physically there and what the jurisdiction will let you do with it. Working alongside civil, environmental and geotechnical engineers, surveyors and general contractors, we look at:
- Zoning, entitlement and what approvals the project will realistically need
- Existing utility infrastructure and available capacity
- Site access, circulation and parking
- Adverse property conditions and deferred maintenance
- Life safety and accessibility issues
- Building dimensions and existing equipment, on a value-add or retrofit
- Providing preliminary budget and schedule information
The budget and the schedule
An honest feasibility study lives or dies on whether the budgets and schedules are real. We build a budget and schedule from real costs and timelines from trade partners and feedback from the local jurisdiction.
- Construction budget
- Preliminary schedule, including entitlement and permitting time
- Cash-flow analysis
- Financing support. We work regularly with banks, attorneys and title companies
- Where the risk sits, and how it can be avoided
What you get at the end
A report with recommendations you can take to your lender, your partners or your board. This is a comprehensive report providing all required information on the opportunity and what the next steps are in order to execute on it if it makes sense to do so.
Common questions
Do I need a feasibility study before purchasing a project site?
We strongly recommend it, especially if the project depends on new construction, a renovation or a change of use. A feasibility study tells you what the work will really cost and how long approvals will take before you are committed to the price.
What does a construction feasibility study include?
A site and building review, the zoning and entitlement path, utility capacity, a budget and schedule built from historical knowledge and trade partner input, cash-flow analysis, and a pre-application meeting with the local jurisdiction. The report closes with recommendations and next steps based on the feedback from that meeting.
How long does a feasibility study take?
It depends on the scope of the project and the study, but a typical timeline is roughly 3 to 6 weeks.